Skip to content
Russellweb
Phase 1 of the Third build

Phase 1 of the Third build

15 February 2020


Having collected the kit and stripped the donors I need to check what had been built and what hadn’t, what needed rebuilding and what was missing.

John appears to have fitted the pedal box, the engine and all of the aluminium panels. The engine mounts were expertly made and the aluminium panels had all been fitted correctly, with sealant and rivets. The pedals were fitted but not torqued up. Everything else was still pretty much unbuilt which was good, I was pretty much building the whole car from scratch and I didn’t have to mark Johns homework.

I gave the brake callipers from the donor a good going over then sent them off to Big Redd to refurbish, more on these in another article.

Once the brakes were posted and on their way it was time to hoist the engine out and carry out some maintenance and checks. One bolt on the water-pump was seized and broken so I had to drill that out before replacing it and the full cambelt and rollers. The cambelt is interesting to set up, you align the cam wheels as usual, but you set the belt tightness by measuring the length of the tensioner spring to be between a range of 5mm. I took my time and got it done, it was fun and a learning experience.