Skip to content
Russellweb

Working in the cold!

18 February 2008


It was between 0 and 2.5 degrees saturday, and I spen all of the dalylight hours in the garage/ working on the drive way! Damn it was cold but I got a lot of things done.

Short list, and photos to follow:

  • Seat is now mounted differently, and more importantly stronger.
  • Gear lever housing is almost finished
  • Battery tray is welded to the chassis, just requires painting but the temprature needs to be above 10 degrees
  • Gearbox mounts are fitted to the chassis
  • Battery earth is fitted
  • Battery positive lead is fixed up to the bulkhead, routed through the fiberglass body support to the battery isolator
  • Hopefully this week or in the weekend the footwell roof and body support will be fitted. The gear lever housing should also be finished soon, then I can do the handbrake housing.